On September 2018, Argotek PSI provided the barge positioning system for the construction of the Cebu-Cordova Link Expressway (CCLEX) foundation.
The 8.5-kilometer CCLEX project is one of the most crucial road projects in the Philippines that will connect mainland Cebu from Cebu City to Cordova town in Mactan Island. The system used Trimble MPS865 for the receiver with two Trimble GA830 rugged antennas for the position and heading with radio correction method to position the span framing of the bridge’s foundation. The Trimble HYDROpro software package for marine and waterway construction was also used for accurate positioning of the rig-piling barge.